GOLEN GOL Hydropower Project (Lot-4.1) Package-I Procurement / Design, Supply, Erection, Stringing, Testing and Commissioning of 113 km, 132 kV Double Circuit Transmission Lines across High altitude of Koh Hindukush (3500 M) i.e. Lowari Top from GolenGol to Chitral to Chukiatan Section

Chitral, Pakistan

Client: WAPDA
Time Period: Feb 2015 ~ Aug 31, 2017 (Sec-I & G/S) Dec 31, 2017 (Sec-II) Jun 30, 2018 (Sec-III)

GOLEN GOL Hydropower Project (Lot-4.1) Package-I Procurement / Design, Supply, Erection, Stringing, Testing and Commissioning of 113 km, 132 kV Double Circuit Transmission Lines across High altitude of Koh Hindukush (3500 M) i.e. Lowari Top from GolenGol to Chitral to Chukiatan Section