NETRACON TECHNOLOGIES has performed outstandingly in Africa and done challenging Jobs by NETRACON are enlisted as under:

GHANA

In the Western regions of Africa, NETRACON TECHNOLOGIES has outstandingly performed to erect and string the 235Km long 330 kV Aboadze – Volta Transmission Line Project. The Transmission Line Starts from Tukuradi Power House and passes through a very difficult terrain of Marshy & Swamp area along the shores of Atlantic Ocean besides crossing the mountainous terrain as well as passing through the thickly populated suburbs of Accra. Despite having all the toughest factors and situations, NETRACON did the job in splendid way by September, 2010 to earn the laurels of the client (VRA) for KEC/NETRACON.

ETHIOPIA

In the eastern regions of Africa, NETRACON TECHNOLOGIES have assisted KEC to complete the construction of 400 kV GILGILGIBE Power Transmission Line Project in Ethiopia. NETRACON TECHNOLOGIES played the most crucial role to complete the project by stringing more than 100 KM of 400 kV Transmission Line through one of the most difficult areas & thick forests of Africa by May, 2009.

NETRACON has completed stringing of 168 KM long 330 kV Volta-Tornu T/Line. Starting mid-June 2013, NETRACON had completed 114 Km by End September 2013 and then remained waiting a serious ROW problem for more than six months before resuming & completing it by February, 2014.

CAMEROON

NETRACON TECHNOLOGIES have shown tremendous efficiency doing the job of Tower Erection & Stringing of 100 KM long 225 kV Kribi – Mangonbe T/Line for Kribi Power Development Company (KPDC – An AES-USA Company) as subcontractor of KEC Int’l. The job was very difficult due to heavy vegetation, forests & continuous rains. All the construction activities were executed under AES – Environmental, Health, and Safety (EHS) Plan to the entire satisfaction of the client. The performance has been highly applauded by the client & end users.