Recent Construction – Grid Stations

NETRACON has honour to perform the 1st project of its nature in Pakistan. Design & Construction of Civil Works, Installation of 150MVA Transformers, Thyristor Valves, Thyristor controlled reactors (TCR), Thyristor switched capacitors (TSC), Harmonic Filters (FC), Cooling Towers, Pumping system, Control and Protection system which follow the ABB’s MACH 2 standards & conventional 132kV bays was completed for ABB Sweden/Pak by December, 2015.

Installation & enormous work of Welding of Aluminum tubular Bus Bars having the current carrying capacity 7000AMP needed specialized & high standard aluminum jointing for more than 5000 joints.

220 kV Mansehra Sub Station (2X250 MVA 220/132 KV Trafo, 4×220 kV L/Bays, 1×13 MVA, 132/11kV Trafo, 6×132 kV L/Bays, CHB; 1085 Sq.M) is under construction which is expected to be completed by March,217. The job is carried out for CHINT-China.

NETRACON TECHNOLOGIES is constructing 132 KV Sub Station at Chitral, Extension works at 132kV Timergarah & Chakdara Grid Stations under EPC contract awarded by WAPDA.

NETRACON TECHNOLOGIES successfully completed six AIS 132 kV Sub Stations under GEPCO at Hafizabad, Pindi Bhattian, Sialkot GIS, Phalia, Gujrat, Chianwali and a GIS Grid station at Sialkot on behalf of Hyundai Engineering Company (HEC) during 2012-13.

NETRACON TECHNOLOGIES, designed & constructed civil works, installed equipment, tested & commissioned GIS Sheranwala Bagh & AIS Khyali By Pass 132 kV Grid Stations in Gujranwala on behalf of ABB/GEPCO in August & October 2015.

NETRACON TECHNOLOGIES constructed, tested & commissioned two 132 kV Sub Stations of Kolo Tarar & Jalalpur Nau (GEPCO area), along with the Turnkey Job of 132 kV Transmission Lines to feed the Grid Stations on behalf of SIEMENS during 2012-13.

NETRACON TECHNOLOGIES undertook the job of up gradation of 33 kV Pullandari Grid Station to 132 kV Level as prime contractor by Islamabad Electric Supply Corporation (IESCO). NETRACON fulfilled the responsibility of construction, installation, testing & commissioning successfully and the Grid station was energized at 132 kV level on 6th June 2012.

NETRACON TECHNOLOGIES erected 220 kV Switchyard for 175 MW Dossan Power House Dherki on behalf of SIEMENS Pakistan.

NETRACON TECHNOLOGIES was responsible for completion of 132 kV Switchyard for 225 MW Combined Cycle Bhikki Power Project on behalf of ABB / DESCON.

NETRACON TECHNOLOGIES designed & Constructed Civil Works, Erected, Provided Protection/control wiring, Cabling and Commissioned Six 132 kV Hybrid Sub Stations of Gulshan e Maamaar, Memon Goth, Jail Road, Azizabad, Gulastan e Johar, RPL, in Karachi and finalizing Design & main civil works of Mehmood Abad (before Court Stay order) for ABB Germany-Pakistan Consortium during 2007-9.

NETRACON TECHNOLOGIES is privileged to have all the necessary resources for installation, Testing & Commissioning Equipment/Tools like cranes, Hydraulic Jacks, Self-lifting Stands, Transformer Oil Treatment Plants, Oil testing Sets, Circuit Breaker Analyzers, Contact resistance Test sets, Capacitance and Dissipation Factor (C&DF) test sets, Winding Ohm Meter & Tap Changer Analyzer Sets, 5-10 kV insulation Resistance Testers, Transformer Turn Ratio (TTR) sets, FREJA-306 Relay Test system, Primary/Secondary injection sets, Hi Pot Sets, Magnus for CTs, Optical Fiber Splicing Machines (FUJIKURA), OTDRs (JDSU), Laser Source, Power Meters as well as skilled & efficient technicians & engineers with rich experience & sufficient international exposure.

Recent Construction – HV & EHV Transmission Lines

NETRACON TECHNOLOGIES have completed a turnkey job of construction of 2×500 kV Double Circuit Quad bundled conductors (42 KMs) & a 220 kV, 52 Km long LILO for 500 kV Shikarpur Grid Station awarded by NTDC on EPC basis. 220 kV T/Lines were energized in March 2016 while two circuits of 500 kV were commissioned in July 2016. The rest are awaiting approval of shut downs on the existing system since then.

WAPDA have awarded NETRACON-NEIE/Holley Consortium a turnkey job of 115 Km Long 132 kV T/Line from Golengol – Chitral across Lawaree Top of 3500 M altitude to Chukitan. Along with 132kV Grid Station at Chitral. Civil Works & Tower Erection are in progress.

WAPDA have awarded NETRACON/IREEE Consortium turnkey job of 85 Km Long 132 kV Transmission Line from Chukitan to Timergarah & Chakdarah Alongwith 132kV Grid Station Extensions at Timergarah & Chakdarah. Detailed Design along Plan & Profile is recently approved and civil works have been started on the T/line.

NETRACON TECHNOLOGIES (JV partner of PCC) has completed the Civil Works, Erection & Stringing of 220 kV Double Circuit, Twin Conductors Bundled Chashma – Ludewala Transmission Line-II. The job of Piling, Pile capping & Elevated Tie beams in the flowing waters of River Jhelum’s Bed in the flowing water conditions were the tremendous jobs done by NETRACON TECHNOLOGIES Civil wing. The Client & the Engineer have hailed the working.

Besides, NETRACON TECHNOLOGIES have completed turnkey Job of 132 kV T/line for Satpara Hydro Works in Skardu, 132 kV T/Line for Pehur Hydro Power Plant in KPK for CMEC/CMIC and completely rehabilitated 132 kV T/line from Jinnah Hydro Power Plant on behalf of Dongfeng, China. NETRACON TECHNOLOGIES have completed 132 kV T/Lines of Hafizabad – Kolo Tarar & Kolo Tarar-Jalalpore for SIEMENS in 2013.

NETRACON TECHNOLOGIES is having sufficient Transmission Lines & civil Works Equipment comprising three sets of latest survey equipment of GNSS-RTK (SOKIA/TOPCON), License of PLS CADD, Tower with long list of construction equipment including Two sets of Tensioner/Puller for Quad Bundled Conductors formation, Two Sets of Tension Puller of Twin Bundled Conductor Formation, one TSE for Single Conductor/OPGW, adequate no of stringing blocks, Bull Wire, Stringing accessories, Cranes, Gin Poles (12 Nos) & Winches. NETRACON owns fleet of 4 wheel Trucks (24 Nos), Long Bed Trailers, Ordinary Tractors (5), 4 Wheel Tractors (2), Excavators (12 Nos), Dumpers (3), Shovels (2 No), Compaction Rollers, Full Bag Concrete Mixers (47 Nos) in addition to a 35 CUM Concrete Batching Plant & Concrete pump.