• Transmission Line

    An efficient transmission line construction formation.

  • Telecommunication

    More then 500 BTS sites have been constructed by NETRACON in the North West mountainous areas of Pakistan.

  • Sub Station

    NETRACON is known for its Quality and Speed to constructs Test and Commission Grid Stations.

  • Social Responsbility

    NETRACON is well aware of its Social Responsbilities. NETRACON is Supporting Kunwal's to run a school to educate childern of downtrodden families from the Slums of Lahore.

Projects
Golen Gol Hydropower Project (Lot-IV) Package-I, 132kV Grid Station at Chitral
Netracon Technologies
Project Name

Golen Gol Hydropower Project (Lot-IV) Package-I, 132kV Grid Station at Chitral

Project Detail

Tender No.

---

Consultant

---

Contractor

NETRACON-NEIE/Holly Consortium

Project Detail

Golen Gol Hydropower Project (Lot-4) Procurement / Design/, Supply Erection, Stringing, Testing & Commissioning of 198KM, 132kV T/Line and 132kV Chitral G/S

Golen Gol Hydropower Plant (108 MV) is being constructed in Chitral. The dispersal of power to the National Grid is an uphill task. 132kV Double Circuit Transmission Line passes through one of the toughest mountainous terrains. The section from Mir Khanni to Chukiatan is to be constructed on 220kV Transmission Line parameter as it crosses Lowari-Top (3200 M). The challenging job is awarded to NETRACON-NEIE/Holly Consortium. The job of route/detailed survey completed. The coordinates were secured using full RTK reference and Rover System , GPS & GNSS. The data was processed on PLS CADD to finalize the tower positioning along out put of Plan/Profile. SI Studies are almost done & most of the design work is completed.

Time Period

--- ~ ---

Location

Chitral, Pakistan

Client

WAPDA

Status

0% Completed

Golen Gol Hydropower Project (Lot-IV) Package-II, 132kV T/Line Chukiatan to Chakdera Grid Station
Netracon Technologies
Project Name

Golen Gol Hydropower Project (Lot-IV) Package-II, 132kV T/Line Chukiatan to Chakdera Grid Station

Project Detail

Tender No.

---

Consultant

---

Contractor

NETRACON Consortium

Route Length

---

1.1. Scope of Work

Golen Gol Hydropower Project (Lot-4) Package-II

Procurement / Design, Supply, Erection, Stringing, Testing and Commissioning of 85 KM Chukitan – Timergara - Chakdara 132kV Transmission Lines & Extensions of Existing 132 KV Chakdara & Timergara Gid Stations

  • Design, Construction, Erection, Testing & Commissioning of 132 KV D/C T/L from Tower Location No. GC-145 near Chukia Tan upto 132 KV Grid Station Timergara (53 km approximately) and connection with 132 KV Timergara and Erection of Towers at Location GC-211.
  • Design, Construction, Erection, Testing & Commissioning of 132 KV S/C T/L from 132 KV Timergara upto 132 KV Chakdara G/S (32 km approx.)
  • Conversion of one (1) 132 kV Iso Bay to 132 kV Line Bay and addition of three 132 kV Line Bays at 132 KV Timergara Grid Station and addition of One (1) 132 KV Line Bay at 132 KV Chakdara Grid Station as per Specifications and Drawings.
  • Construction of 8 Nos. Staff Quarters at 132 KV Chakdara Grid Station.
1.2. Objective & Brief of the Project

The main objective of the transmission line project is the dispersal of the Generation of 108 MW Electricity to be generated by Hydropower project at Golen Gol. This will bring a bit relief to the increasing demand of Electricity in the country. The extensions of 132 KV existing Timergara and Chakdara Grid Stations have been proposed for meeting the demand of the local population of the Lower Dir Valley.

Time Period

--- ~ ---

Location

Chitral, Pakistan

Client

WAPDA

Status

Survey in Progress

Golen Gol Hydropower Project (Lot-IV) Package-I, Power T/Line Lowari Top to Chukiatan
Netracon Technologies
Project Name

Golen Gol Hydropower Project (Lot-IV) Package-I, Power T/Line accross 3000M Altitude Lowari Top to Chukiatan

Project Detail

Tender No.

---

Consultant

---

Contractor

NETRACON-NEIE/Holly Consortium

Route Length

198KM

Scope of Work

Golen Gol Hydropower Project (Lot-4) Procurement / Design/, Supply Erection, Stringing, Testing & Commissioning of 198KM, 132kV T/Line

Project Detail

Golen Gol Hydropower Plant (108 MV) is being constructed in Chitral. The dispersal of power to the National Grid is an uphill task. 132kV Double Circuit Transmission Line passes through one of the toughest mountainous terrains. The section from Mir Khanni to Chukiatan is to be constructed on 220kV Transmission Line parameter as it crosses Lowari-Top (3200 M). The challenging job is awarded to NETRACON-NEIE/Holly Consortium. The job of route/detailed survey completed. The coordinates were secured using full RTK reference and Rover System , GPS & GNSS. The data was processed on PLS CADD to finalize the tower positioning along out put of Plan/Profile. SI Studies are almost done & most of the design work is completed.

Time Period

Feb 2014 ~ Apr 2016

Location

Chitral, Pakistan

Client

WAPDA

Status

Survey Completed Soil Investigation in Progress

500KV & 220KV Transmission Lines LILO for 500KV Shikarpur Grid Station
Netracon Technologies Netracon Technologies
Project Name

500KV & 220KV Transmission Lines LILO for 500KV Shikarpur Grid Station

Project Detail

Tender No.

SHK-002

Consultant

BARQAAB Consulting Service (Pvt.) Ltd.

Contractor

SUNIR-NETRACON JV

500KV T/Line Route Length

32km

220KV T/Line Route Length

52.5km

Scope of Work

Design, Manufacture, Supply, Installation, Testing and Commissioning of 500kV D/C Two Transmission Lines for looping In & Out of 500kV Dadu-Guddu Transmission Line Circuits 1 & 2 and 220kV D/C Transmission Line for looping In and Out of 220kV Guddu-Sibbi Transmission Line at 500kV Shikarpur Substation.

Time Period

Apr 2012 ~ Dec 2015

Location

Shikarpur, Sindh

Client

NTDC

Status

35% Completed

Completed Projects
Sub Stations

Imam Sahib, Afghanistan

Oct 2011 ~ Feb 2013

Completed Projects
Sub Stations

Mehtarlam, Afghanistan

Oct 2011 ~ Feb 2013

Completed Projects
Sub Stations

Sare Pul, Afghanistan

Oct 2011 ~ Feb 2013

Completed Projects
Sub Stations

Sher Khan Bandar, Afg

Oct 2011 ~ Feb 2013

Completed Projects
Sub Stations

Taluqan, Afghanistan

Oct 2011 ~ Feb 2013

Subscribe For News / Newsletter

Global
Exposure

NETRACON exist over 8 countries and we have passion to serve the whole world...



Copyright © 2009 - 2010 Netracon Technologies. All Rights Reserved. Privacy Policy